Matters need attention about the installation of
colloid mill:

1, connected to the feed hopper or feed pipe and outlet, and then connected to the discharge pipe, and then connected to the cooling water and drain pipe.
2, install the power start device, connected to the power, the special attention to the direction of operation, to determine whether the normal direction of rotation of the motor, or from the direction of the feed pipe to see whether the direction of colloid grinding 'red warning signs' rotation direction arrow Coincide smoothly. Absolutely prohibit idling and reversal.
3, at the factory, the device out of the box on the box has been equipped with a good set of screws, grinding disc gap in the best processing fineness spacing. Adjust the disc gap, the first discharge box on the upper limit of the screw on the box, without the case of the boot plate (dial) on the two handle 'counterclockwise' loose, and then 'clockwise' turn the adjustment disk, when the rotation adjustment Disk feel a little resistance to stop immediately, then adjust the scale on the adjustment plate on the body of the pointer to determine the dynamic and static disc gap is '0'. But the scale of the circle on the reading number to remember that the number is not 0 degrees and the disc between the '0', and then reverse (counterclockwise) to adjust the disk a few laps to move, static disc gap slightly greater than 0. Adjust the disc scale for each advance and retreat a large grid is 0.01mm. Generally in the case of processing materials to meet the fineness of the requirements, as far as possible to keep the disc gap to a certain distance, while the handle will adjust the disk lock, and then the inlet box on the upper limit screw to adjust the machine to ensure the normal operation of the machine.
4, connected to the cooling water, the injection of about 1 ~ 2Kg liquid or other materials associated with the processing of materials, and the wet material maintained in the cycle through the cycle of the state. And then can start the colloid mill, to be running immediately after the normal feeding into the colloid mill processing production.
5, before the shutdown, into the hopper to join or cavity to leave the right amount of water or other materials associated with the processing of materials, and wet material maintained in the circulation through the cycle of the state. The boot should also keep a certain amount of wet material within the hopper can be reflow state and immediately put into the material, otherwise it will damage the hard combination of seals and even cause leakage burn the motor.
6, processing materials pay attention to motor load, found to reduce the load overload.
7, colloid mill in the action, never allowed to close the discharge valve, so as not to wear the chamber pressure is too high and cause leakage.
8, colloid grinding is a high-precision machinery, grinding disc gap very little, moving speed fast. Operators should adhere to the post, according to regulations, found fault in time to stop, after troubleshooting and production.
9, colloid mill use, should be completely disinfected, clean the body inside, do not make the material remaining in the body, so as to avoid hard mechanical bonding and damage to the machine.